← All Projects
Coworking Space · Magarpatta City, Pune

Techila Networks

A 9,400 sq ft client-facing workspace in Magarpatta City — a calm front-of-house, two private team neighbourhoods, and a flexible event spine that handles client demos, training, and after-hours all-hands. Delivered in 40 working days.

9,400 sq ft 40 days Coworking Delivered 2024
Project · 2024 Techila Networks cover image
9,400Sq ft delivered
40 daysTotal timeline
1,200 sq ftConvertible event spine
Demo-readyFirst client session day 8
₹85L–1.1CrBudget band (indicative)
Brief

Two teams in private mode. One demo spine the whole floor can share.

Techila needed two acoustically separated team neighbourhoods that could run head-down work, plus a flexible spine that opens up for demos, training cohorts, and all-hands. The same floor had to read calm during a quiet day and energetic during a client visit.

Site reality

An MCH-built shell with mature services.

Magarpatta City’s newer towers ship with reliable services and decent stack heights, but landlord rules cap floor loading and limit core-drilling. We designed every joinery piece to land lightly and routed all MEP additions to the existing services trench.

Design response

A movable spine, a calm perimeter.

Operable acoustic walls along the central axis convert four small rooms into one 1,200 sq ft event space in under five minutes. The perimeter stays untouched — desks, focus rooms, and a quiet library — so the team can keep working while the spine is in event mode.

Execution

AV pre-commissioned. Lighting scenes saved per mode.

Three lighting scenes — Work, Demo, After-Hours — preset and switchable from a wall pad. Every event room is wired for 4K presentation, dual-mic pickup, and Teams/Meet/Zoom call rigs. We tested all three modes during the week before handover.

Result

First client demo on day 8. Event spine converts to 1,200 sq ft in under 5 minutes.

Techila ran its first client demo on day eight of occupancy — 3 days post-handover. The operable wall spine converts four rooms into a 1,200 sq ft event space in under five minutes. Acoustic separation passed the real-world test the same week: a private team neighbourhood ran a heads-down focus session while the spine hosted a 60-person training cohort. Fixed-price contract closed with zero variations against original BOQ.

The first office where I’ve seen private work and an active demo happen on the same floor without compromise.
Operations Lead · Techila Networks (paraphrased)
Scope of work

Everything Vektor owned on this project.

Space planningDual-mode layout, operable walls, sightline study.
Interior designFront-of-house, joinery, library, calm material palette.
MEPLighting scenes, HVAC zoning for event mode.
AVPre-commissioned demo rigs, dual-mic pickup, 4K display.
Operable wallsAcoustic-rated movable partitions on the central spine.
Project managementSingle PM, daily reports, 90-day support.
Numbers at a glance
9,400 Sq ft delivered
40 days Total timeline
1,200 Sq ft event spine
3 Private team zones
₹85L–1.1Cr Budget band (indicative)
Delivery timeline

Phase-by-phase, in calendar order.

Phase 01Brief & audit

Hybrid-mode workshop, capacity model — week 1.

Phase 02Design

Layouts, mode studies, 3D — weeks 2–3.

Phase 03Procurement

BOQ lock, AV vendor freeze — week 3.

Phase 04Build

Civil, MEP, joinery, AV in parallel — weeks 4–7.

Phase 05Handover

Mode rehearsal, snag closure, support handover — week 8.

Have a space like this in mind?

Tell us about your site and timeline. We will come back with a fixed-price build plan, a 3D walkthrough, and a delivery schedule.

Start a Project